Interesting that they're using a chain lift to emulate a launch, I always thought cable lifts were faster. Hopefully this doesn't detract from the ride at all
RollerCoasters
A place to talk about roller coasters and parks that have them. Everyone is welcome here to both learn and to celebrate these magnificent machines designed to scare you.
Here are some important resources:
Images are welcome if they are of high quality and it doesn't get out of hand. Please use PostImages to upload your image and then use that link in the URL field of your post (other image sites are permitted but Post Images has the best policies and compatibility).
Some basic rules:
-
Opinions, theories, and facts are all welcome – but be clear about what you’re saying.
-
Back up facts with sources as much as possible
-
No spam or sell-promotion. Linking to your own media or site is permissible only if it’s specifically related to a topic/post that someone else created.
-
No photos or videos taken on the rides. This is dangerous and shouldn't be encouraged.
-
Limit political discussion. When discussed it must be park related.
-
No fictional coasters (models, no limits, planet coaster, etc)
-
No posting personal information.
-
No shaming of anyone. We all can continue to learn and not everyone knows everything -- and that's ok.
The whole scenario is perplexing. While the launch hasn't been free of issues it seems that the majority of the issues with LR has been the structure and a fair amount of the rollbacks were actually the ride shutting down because the structure triggered a fault. For me, adding a lift that pushes the same speed as a launch would create similar issues..... Maybe it's just a slower acceleration profile.
As for the cable lift, you don't really see those outside of alpine coasters and Intamins..... I think having RMC play with something else new would be a whole different can of worms lol
From what I understand, the LSM fins require perfect alignment to launch (hence the constant issues from the shifting wooden structure), while a chain lift will have a much higher tolerance. I do agree that the should just replace the entire thing with ibox track, and a steel structure for the lift, at this point, but anything that gets it to be reliably operational is certainly welcome.
I never even thought about that aspect of things. I had always assumed it was just a safety system trip where the worry was the structure was compromised but yea the fin segments not being perfectly in line would be horribly bad in many ways.