this post was submitted on 14 Jun 2023
3 points (100.0% liked)

Portland

49 readers
1 users here now

founded 4 years ago
MODERATORS
 

The longest service interruption in TriMet's history is set to start Sunday, June 18. The public transit agency will halt MAX Red Line service between the Gateway Transit Center and Portland International Airport (PDX) for 126 days.

top 4 comments
sorted by: hot top controversial new old
[–] UltimoGato 1 points 2 years ago

Thank you for sharing. I have a friend coming into town for a conference in a couple of weeks and they were all told to take the red line to their hotel.

[–] jordanlund@lemmy.one 0 points 2 years ago (1 children)

We rode through on Sunday and, yeah, looks like a big project. I'm still not 100% sure what they're trying to do. Looks like improving the arrival and departure tracks?

[–] crowsby@lemmy.ml 1 points 2 years ago (1 children)

Looks like adding a second track:

add a second track to sections of the Red Line between the Gateway Transit Center and PDX, which TriMet says will improve system-wide reliability.

The timing seems questionable though. I'd think that any time other than our absolute peak travel season would have been better.

[–] regul@vlemmy.net 1 points 2 years ago

Construction in the mud would probably take even longer though.